NEWS CENTER
Suzhou Zuo Nan Precision Sheet Metal Products Co., Ltd. Announcement Materials
Release time:
2019-10-11 10:21
Source:
2019-320509-33-03-540929 Suzhou Zuoquan Precision Sheet metal Products Co., LTD. Annual output of clean environmental protection products 1000 sets, precision sheet metal products 3000 sets of projects
I. Name and summary of the construction project
Project name: Annual output of clean environmental protection products 1000 sets, precision sheet metal products 3000 sets project;
Project nature: New (replacement)
Total investment: 6.5 million yuan;
Industry Code: C3399 Other not listed metal products manufacturing
Construction site: No.949 Jinchang Road, Jinjiaba, Lili Town, Wujiang District
Second, the possible impact of the construction project on the environment
1. Waste gas: The organized emission of waste gas in this project is mainly laser cutting waste gas. The generated laser cutting exhaust gas is collected by its own collection device and then entered into the exhaust gas filtration treatment device for treatment, and the exhaust gas is discharged by a 15m high exhaust cylinder (1#). The welding exhaust gas is treated by the mobile dust purification device equipped with each other, and its collection efficiency and treatment efficiency are high. A small part of the uncollected exhaust gas, grinding exhaust gas and cutting fluid exhaust gas are discharged in the workshop without organization through the workshop ventilation device. It has less impact on the surrounding environment.
2. Waste water: No production waste water is discharged in this project; The wastewater of the project is mainly domestic sewage of the employees, with 60 employees, and the output of domestic sewage (1440t/a) is small. The sewage collection network at the site of the project has not been connected, and the generated domestic sewage has been entrusted to sanitation for cleaning and transportation recently, and can be directly transferred into the Luxu sewage treatment plant in Wujiang District for centralized treatment in the long term.
3, solid waste: scraps, metal scraps and unqualified products, waste sanding sandpaper collected and sold; Waste packaging drum, waste cutting fluid and waste oil are hazardous wastes and shall be disposed of reasonably by qualified units; Waste filter element, welding slag, collected particulate matter and employees' household waste are entrusted to the sanitation department for unified disposal. Do not cause secondary pollution to the external environment.
4. Noise: After certain measures are taken for the noise source of the project, the project noise can be discharged up to the standard, and the impact on the surrounding acoustic environment is weak, and the phenomenon of noise disturbance will not be generated.
3. Key points of environmental impact assessment conclusions presented in the environmental impact report form
After the implementation of various pollution prevention and control measures proposed in this EIA, all pollutants can be discharged up to the standard, in line with the principles of total amount control, energy conservation and emission reduction. After the implementation of the project, each pollutant will make a small contribution to the surrounding environment after being treated and discharged up to the standard, and the local environmental quality can still maintain the status quo. Through the assessment of the environmental status of the area where the project is located and the analysis of the environmental impact of the project, it can be considered feasible from the perspective of environmental protection after the strict implementation of various pollution prevention measures proposed in the EIA.
4. Public access to the environmental impact report form
Within 5 working days from the date of announcement, the public can query the complete environmental impact report form of the project on the website, and if necessary, they can obtain more supplementary information from the construction unit or the evaluation unit by E-mail, telephone, fax, letter and other means.
5. Scope and main issues of soliciting public opinions
The object of public participation survey of this project is mainly the public living along the route. If the public has opinions on environmental protection of a construction project, it may submit them to the construction unit and the EIA unit, and leave its name, contact information and contact address.
The main opinions of the public include the status quo of local environmental quality, the degree of understanding of the project, the degree of impact of the project construction and operation on work and life, the attitude towards the project construction and other opinions and suggestions.
6. Specific forms of soliciting public opinions
The public can give feedback by telephone, fax, letter, E-mail, etc., or directly to the construction unit or the contact person of the EIA unit for feedback in person.
(1) Contact information of the construction unit
Construction unit: Suzhou Zo湶 Precision sheet Metal Products Co., LTD
Contact: Chen Yongjia
Address: No.949 Jinchang Road, Jinjiaba, Lili Town, Wujiang District
Contact number: 13918405987
(2) The name and contact information of the environmental impact assessment institution
Environmental impact assessment unit: Suzhou Qingquan Environmental Protection Technology Co., LTD
Certificate Number: EIA Certificate B No. 1994
Address: 6th Floor, Block B, No.117 Zhujiang Road, Suzhou, China
Contact: Mr. Li
Tel: 0512-66061225